FLAT ROOF SUBCONTRACTORS NEEDED!
Must have experience with TPO and EPDM
 
We will buy the material, dumpsters and handle all permits.
 
YOU MUST FILL OUT THE FORM BELOW AND DETAIL YOUR APPROXIMATE LABOR COSTS PER JOB.

Mercer County

1600SF CORNER BLDG WITH HUGE PARKING LOT

Labor to be done:

  • Remove current  roofing material using the machine we will rent to get the stone off the bldg
  • Prepare the underlayment at various pitches for the new TPO to be inserted
  • Install any plywood that may be needed if old is rotted
  • Install TPO, seal seams etc
  • also, we just go right over the current roof too

Expected MATERIAL LIST but you will need to confirm at job site:

20 sq TPO Rubber mule hide
200 ft of drip edge 0.32
2 Rolls of cover tape
1 gallon of primer
1 Bucket of screws
1 Buckets of bavbed plates CME mechanical work
1 Box of Racks
20 AA Insulation 1/2to1
10 A 1 to 1.1/2 insulation
10 B 1,1/2 to 2 insulation
10 c 2 to 2.1/2 insulation
3 , 2 inch insulation sheet 4×8
Screw size pending three and 5 inches probably
3 universal white sealing tubes

 

 

Qualifications:

  • Must have all tools to do job
  • Licensed with the NJ
  • Workers compensation and General Liability insurance
  • Unlettered Van or Truck is preferred
  •  
  • Let us the know your labor costs under both removal of old roof/install and installing over old roof 

Possible Job number 2 in mercer

9700SF BLDG WITH HUGE PARKING LOT

Labor to be done:

  • Remove Solar Panels 1/4 of the bldg at a time and keep panels on the roof. (180 panels total)
  • Remove current stone and roofing material using the machine we will rent to get the stone off the bldg
  • Prepare the underlayment for the new TPO to be inserted
  • Install any plywood that may be needed if old is rotted
  • Install TPO, seal seams etc

Expected MATERIAL LIST:

1- 110 sq Rubber TPO Mule Hide
2- 500 ft of drip edge 0.32
4- 5 Rolls of cover tape
5- 2 gallons of primer
6- 330 Insulation sheet 1 inch
7- 4 Bucket of screws c we determine long in a few
8- 4 Bucket of BAVBED plates Cme mechanical work
9- 3 Boxes of Rack
Screw size pending three and six inch probably
10- 1 can 5 gallon cleaner
11- 12 tubes of weather block
12- 12 universal white sealing tubes
Mechanical work, On tap of the stone we put the Insulation

 

Qualifications:

  • Licensed with the NJ
  • Workers compensation and General Liability insurance
  • Unlettered Van or Truck is preferred
  • Dump Trailer helpful but not necessary
fill out the form below